A Full Home Transformation

From Dated and Divided to Open, Elevated, and Entertaining-Ready

A full home renovation is different from updating a single room — it's about reimagining how your entire home lives, room by room and space by space. At Leo Lantz Construction, that process follows the same four-stage journey as every project we take on: consultation, design, execution, and completion. A whole-home project of this scope — structural wall removal, a full kitchen rebuild, fireplace makeovers, and whole-level flooring — typically takes 3 to 5 months from demolition to final walkthrough, depending on permitting timelines and material lead times.

Full Renovations Gallery

View the transformation by moving the sliders below:

Museum District Home Remodel

Bottoms Bridge Basement Bar (National Award Winning)

Lower Tuckahoe Kitchen

Lower Tuckahoe Kitchen Renovation

What to Expect: Our Full Home Renovation Process

In-Home Consultation & Structural Assessment

existing layout, discuss your goals, and identify which walls or systems may need to change to achieve them.

Design & Space Planning

Our team develops a full floor plan for the connected spaces, along with cabinetry, stone, tile, and lighting selections.

Detailed Proposal & Project Timeline

You receive an itemized scope of work, transparent pricing, and a phased schedule before demolition begins.

Permitting & Engineering

We handle structural engineering for wall removal, pull all permits, and coordinate inspections throughout the project.

Demolition & Structural Work

Walls come down, beams go in, and rough electrical, plumbing, and HVAC adjustments are completed.

Framing, Fireplace & Cabinetry Installation

New structural elements, the fireplace surround, and custom cabinetry take shape.

Flooring, Tile & Finish Carpentry

Hardwood is refinished and blended, tile and stone are installed, and trim and millwork are completed throughout.

Final Detailing & Walkthrough

Lighting, hardware, and fixtures are installed, every space is inspected together, and the project is backed by our workmanship warranty.

What Changed, Room by Room

Features Included

Removal of load-bearing and non-load-bearing walls to open kitchen, dining, and living areas
Oversized center island with waterfall-edge quartz countertop and deep hunter-green cabinetry
Custom butcher-block countertops along the perimeter cabinetry run
Soft dove-gray glass-front upper cabinets with brass hardware throughout
Undermount stainless workstation sink with integrated accessories
Built-in beverage/wine storage and display niche
New floor-to-ceiling stacked-stone fireplace surround with wood mantel
Full-height subway tile backsplash
Antique brass and glass globe pendant lighting over the island
Open sightlines from kitchen through dining into the living and sunroom areas
Refinished wide-plank hardwood flooring extended throughout the main living level
New window and door trim package for a cohesive, elevated look throughout
Updated recessed and decorative lighting package in every renovated space

Why Choose Leo Lantz Construction?

Leo’s not just the name on the truck, it’s your partner throughout the process. From your first call to the final walkthrough, you’ll work with a team that truly cares.

What makes us different:

Leo’s insight and honesty throughout the process
Real stories from real Richmond families
Quality craftsmanship backed by decades of local and industry trust
Transparent, friendly communication every step of the way

Frequently Asked Questions

How do you decide which walls can come down to open a floor plan?

Before any demolition, our team works with a structural engineer to identify which walls are load-bearing. Load-bearing walls can often still be removed — they’re just replaced with a properly sized structural beam, which is exactly what we did to open this kitchen into the living space.

Will opening up my floor plan require updates to electrical or HVAC?

In most whole-home openings, yes. Combining rooms typically means relocating outlets, switches, and light fixtures, and it’s often a good opportunity to rebalance HVAC ductwork so the newly combined space heats and cools evenly.

How long does a full home renovation like this take?

A project of this scope — structural wall removal, full kitchen rebuild, new fireplace, and whole-level flooring — typically takes 3 to 5 months from demolition to final walkthrough, depending on permitting timelines and material lead times.

Can existing hardwood floors be matched and extended into newly opened spaces?

Yes, in many cases. Our flooring team can often match existing wood species and stain, blend new and old sections, and refinish the entire level as one continuous surface so there’s no visible seam between old and new.

Do we have to move out during a whole-home renovation?

It depends on scope and how many living areas are affected at once. For projects like this one that touch the main gathering spaces, many clients choose to relocate temporarily for comfort, though we always build a phased plan to minimize disruption wherever possible.

Can you replace a builder-grade fireplace surround without a full rebuild?

Yes — in most cases we can remove the existing surround and rebuild it with stone, tile, or millwork while keeping the existing firebox and gas or wood-burning components intact, which is how we transformed the fireplace in this home.

Leo Lantz Construction, Inc. is a Richmond-area remodeling company specializing in whole-home transformations that combine thoughtful design with lasting craftsmanship.

Thinking about opening up your own floor plan? Contact us today at (804) 262-3360 to schedule your in-home consultation.

Mon–Fri: 8:30 AM – 4:30 PM  |  Sat & Sun: Closed
11671 Greenwood Rd, Glen Allen, VA 23059